Lower Road – Temporary closure to install 20mph Zone, 6th March 2023
It will be necessary to close part of Lower Road, River, from 6th March 2023 with estimated completion by 6th March 2023. Lower Road, River, will be closed between the…
It will be necessary to close part of Lower Road, River, from 6th March 2023 with estimated completion by 6th March 2023. Lower Road, River, will be closed between the…
Details of highway works scheduled to take place in November 2022 have been received by trhe Parish Council. The dates are subject to change as works often overrun or are…
Kent County Council is launching a new system to enable Kent residents experiencing financial hardship to quickly and easily find the support they need. ‘ReferKent’ is an online referral system…
Southreastern Railways are making some small changes to the timetable this autumn. From 9 October, some morning trains will leave a few minutes earlier. Evening trains will leave London at…
The Operation Brock contraflow will be removed overnight on Saturday 3rd September 2022. This means that work on the M20 Moveable Barrier Scheme can restart. The moveable barrier will remain…
A Statement From Affinity Water: Rainfall over the last autumn and winter was less than the long-term average, which has resulted in groundwater levels in all our regions being below…
https://one.network/?tm=130527087
https://forms.gle/BqzTFQUSaba2iNhz5
SoWN-21-06-2022-Lewisham-Road-and-Crabble-Road-Dover-Micro-Surfacing-1Download